Manual work wrapped up on July 17

We did about all we can reasonably do without heavier equipment. The sidewalk is very passable. At the Public Safety Committee meeting on July 20 we received reports from the Transit department, police department and comments from citizens. City Council will consider the issue of reopening the bridge at its August 24 meeting.

About these ads
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s